Blog

Curbside planters aim to combat stormwater runoff

In spring 2019, several new in-ground planters were installed along a few of Atlanta’s bustling streets, but these aren’t just any old planters meant to showcase your favorite blooms; rather, these are thoughtfully designed “stormwater planters” that will reduce flooding and other impacts from urban runoff.

The four planters were installed on either end of Atlanta—two are located in West View and two in Inman Park. Each directs stormwater off the streets and into structures filled with rocks, engineered soils, trees and other native vegetation where it can slowly infiltrate back into the ground instead of sending polluted stormwater straight to creeks and the river.

We launched the ‘Green Streets and Clean Streams’ project in partnership with Trees Atlanta. Working with cooperation from the City of Atlanta and enthusiastic volunteers, we installed the planters in strategic locations in the city to enhance local tree canopy and beautify curbsides while also reducing the impacts of stormwater runoff from paved surfaces. The initial installments were made possible through the support of the Georgia Center for Nonprofits, The Home Depot Foundation’s Building Community Network and a grant from the Bank of America.

Typically, cities manage runoff through “grey infrastructure,” a series of drains that carry untreated stormwater into underground pipes that empty to nearby streams or rivers. The Green Streets and Clean Streams project adopts “green infrastructure,” which manages rainwater where it falls and restores the natural flow of water through a landscape. “Trees Atlanta was excited to work with CRK on this project,” said Kelly Ridenhour, Trees Atlanta Project Coordinator. “We always want to highlight the role trees play in the management and filtration of stormwater,” said Kelly Ridenhour, Trees Atlanta Project Coordinator.

CRK also installed water level sensors in the planters to measure their effectiveness in collecting and draining stormwater. Early results indicate the project is a success. Now, the goal is to develop a replicable, cost-effective model for implementing street-side green infrastructure installations in communities throughout the Chattahoochee watershed.

This story originally appeared in our Summer 2019 edition of RiverChat. 

Related Posts

Protect the Chattahoochee River from pollution

The Chattahoochee River needs your help. Please tell Georgia’s Environmental Protection Division to hold polluters accountable and to protect the river from sewage pollution.  Last summer, Fulton County’s Big Creek…

Atlanta wastewater treatment plant experiences upset, monitoring ongoing

Updated April 16, 2024:  Chattahoochee Riverkeeper (CRK) remains concerned about potentially dangerous bacteria levels in the Chattahoochee River downstream of the City of Atlanta’s R.M. Clayton Water Reclamation Center. Water…

Alabama & Georgia on Path to Resolve Water War?

Chattahoochee Riverkeeper is cautiously optimistic about the Apalachicola-Chattahoochee-Flint Agreement recently announced by the Governors of Alabama and Georgia and the U.S. Army Corps of Engineers. Chattahoochee Riverkeeper is optimistic because…

close
Go to Top
en_USEnglish